Stages of Construction of Wooden Structures

After signing the contract, the technical and engineering office, on the basis of the employer’s request, offers 3 types of building plans in 3D, after approving and approving the map and visiting the land, the employer is only obligated to provide electricity and water to the representatives of the group. And the other steps involved in equipping the workshop, implementing construction and construction are the responsibility of this group. The implementation of lightweight for buildings in this group is in the form of reinforcement and concrete, and the building style has three faces: all-wood stucco (built in the site), the entire log frame, and the prefabricated skeleton (built in the factory and installed locally) is.